TajmaYour Team, Plus AI

Create a room, invite your team, and @mention AI experts to think, validate, and decide faster.

Free forever for small teams. No credit card required.

CFO

Where do we land on YoY revenue if Q3 holds flat?

Analyst

Mid-case forecast: +18–22% YoY with current pipeline velocity. Downside if enterprise slips two deals.

Team and AI agents collaborating around a table in Tajma

Why Tajma?

Designed for high-stakes collaboration where every perspective counts.

  • Multiple Perspectives

    Spin up role-based AIs (CFO, Analyst, or your own) with tailored prompts that stress-test ideas and widen how you think.

    Convinced?
  • Single Timeline

    Humans and AIs in one transparent thread, no separate silos. Everyone stays aligned on the context of every decision.

    How about now?
  • Actionable Reports

    Convert any session into a structured report for follow-up. Turn messy brainstorms into executive summaries instantly.

    I'm sure you are now

How it works

  1. Open a Room

    Create a focused space for a project or decision. Name it, set the goal, and define the scope.

  2. Invite & Customize

    Add team members and design AI participants with specific prompts tailored to your industry and specific needs.

  3. Collaborate & Decide

    Chat naturally, @mention AIs for input, and generate the final report to ship your decisions faster.

Q3 Strategy Room

Sarah, Mike, + 2 AI agents

We need to review the budget for the expansion. @CFO, what's our burn rate if we hire 5 more engineers?

CFO AI

Based on current revenue, adding 5 engineers increases monthly burn by $85k. Total runway would decrease from 14 to 11.2 months.

@Analyst — model a scenario where we delay hiring by one quarter. How does runway change?

Analyst AI

Delaying hires by Q saves ~$255k. Runway extends to roughly 13.1 months at current burn, assuming flat revenue.

Thanks. @CFO any red flags if we go hybrid: 3 engineers now, 2 next quarter?

CFO AI

Hybrid smooths cash outflow. Mid-case runway lands around 12.4 months. Main risk is delivery slip if capacity lags demand.

Let's lock the hybrid plan. I'll update the board deck — @Analyst can you summarize bullets for the appendix?

Analyst AI

• Hybrid hire: 3 now / 2 Q+1 • Runway ~12.4 mo mid-case • Watch: revenue vs. delivery timeline

Ask @CFO or @Analyst…